Archive for the ‘Empanage’ Category

Wing kit is now in my garage!

Monday, July 13th, 2009
IMG_9377.JPG
 
 

So the wings are here now.  I got them on the 10th of July, but it was my 11 year anniversary weekend so not much time to work on them.  I was able to get the kit unpacked and put away.  I also built the leading edge cradles and broke down all the crates.  On Sunday I started to work on the left main spar some.  One thing I noticed was how much harder the directions are to understand on the wings than the tail cone, it is going to take some community help to get through some of this.

Empanage is done, wings ordered.

Sunday, May 10th, 2009
IMG_9120.JPG
 
 

I finished up all I planed to on the empanage last  week.  I am waiting for the fiberglass and wiring until I put the whole thing together.  It was really great to see the whole thing together.  The rudder and elevator bolts take some patience to get on but other than that it all just bolts together.  I order the wings on Friday and Saturday got a letter from Vans letting me know they will ship the week of June 22.  I hope to get my honey do list done by then and get the garage on order to build the wings.  I want to get the wing cradle done before they arrive as well.  Started to move parts of the empanage to my parents house for storage and put some parts I am keeping at my house away from kids reach.  I am going to miss riveting for a while, but need to break to get things done around the house.

One more piece done!

Sunday, May 3rd, 2009

IMG_9092.JPG
 
 

I am now finished with the tail cone and have started the work to assemble all the tail parts.  I had my father in law help me rivet the rest of the tail cone together (I was on the inside).  Today I began assembly of the empennage.  All is fitting together well.  I am learning quickly how to remove and replace bolts between the elevators and the HS.  The HS trailing edges line up almost perfect, but one trim tab has a 1/4 inch warp in it.  I might have to replace that before I am finished with the plane, but can wait for now.  I need to hurry up and finish the assembly so that I can move the prats to my parents house and Heather can get her car back in the garage.

IMG_9074.JPG
 
 

Back to back posts, I know I’m going crazy!

Sunday, April 26th, 2009
IMG_9018.JPG
 
 

The main reason behind todays post is I finally got the wife out in the garage to help me rivet and she did great.  Yes I am wearing my flying headphones to rivet, but I needed to let Heather use my hearing protection.  I hope that Heather and I can finish the other side tomorrow.  Heather turns out to be great at riveting and I think she secretly enjoys it.  We will have to see how much I can get her to help in the future.

Flying and building in one day!

Saturday, April 25th, 2009
IMG_9012.JPG
 
 

So today I had fellow RV-10 Builder Tim Nash come over and help me buck some rivets on the bottom of the tail cone. We got all the stiffeners in and then went to the local airport (KJYO) and took a Warrior out for .8 hours.  I have not flown since I got my instrument rating and wanted to put some air beneath me.  Once Tim gets his BFR done I can put on the foggles and maintain my IFR cert.  I hope to call on another RV builder tomorrow so I can finish up all the two person rivets this weekend.  I am also getting ready to order the wings.  I am trying to time it right so that I can get my honey do list done before they arrive and I know once they are here I will be working on them and nothing else.  Work has been a bear lately driving to Baltimore for meetings all the time, but that is putting more money in my pockets for the plane so can’t complain to much.  We will see what this week brings and maybe I will have another post that shows a completed tail cone.

Riveting the tail cone!

Monday, April 20th, 2009
IMG_8999.JPG
 
 

So I am now working on the tail cone.  It is a lot bigger than I thought it would be (or my garage is smaller than I thought.)  I hope to have it all riveted together in the next week or two depending on if I can find help bucking or not.  Then I will order the wing kit and start to assemble all the tail pieces for a picture before I ship the pieces off to my parents house.  I have not been working on the plane much over the last two weeks as I have been working mad hours and driving to Baltimore.  I also need to find time to go flying again as I need to do some instrument approaches to keep my license valid.  Building, flying and finding time to ride my bike is getting harder, especially with the kids in sports and stuff.  Well as they say, time to pound those rivets.

Build update

Thursday, March 26th, 2009
IMG_8946.JPG
 
 

So it has been a while since I posted last. I am now almost done the elevators and started the tail cone. For those considering building an RV-10 I would recommend when ordering the tail kit go a head and order an extra set or two of parts for the trim tabs. This way when you mess up the first one, then the second one you can quickly learn from your mistakes and try a third time. I am still not as happy as I would like to be with mine. If I were to do them over again I would do some things in a little different order. I would prime them before putting them in the brake. I would bend the bottom of the skin up before bending the sides closed and I would not use the triangle over triangle method to fold the edges. The problem I found was when bending the first side of the edge all looked great, but when bending the top of the skin you can not get the blocks as close to the bend line as you could on the first side. This causes the sides to not be square and makes the holes real close to the bends. Overall trim tabs sucked. Keep pounding those rivets.

EAA Tech Adviser gives her a once over.

Sunday, March 1st, 2009

So today Richard Koehler came by to look over my work. He is a technical adviser from EAA chapter 168. He spent his time inspecting my vertical stabilizer, horizontal stabilizer and rudder. We also spent a lot of time talking about engine choices. While this may be premature I am glad we did. After talking with Dick I have decided to buy a used engine that is about at its overhaul limit and then overhaul the engine with Dicks help. This way I get a engine that is to new standards and get to learn all about the engine. Kills two birds with one stone.
I have also been working on the elevators. I spent the better part of this weekend match drilling them and decided to make a little video of it. I hope to actually create useful videos in the future, but this is all I have for now.{RV-10 Videos}